The 296,000 sq foot roof was recovered with a tan thermoplastic polyolefin (TPO) single-ply roofing membrane, replacing the original gray roof membrane installed in 1990. Included in the scope of work was removal of the (center) eyebrow roof at the southeast entrance.
NMU Project Manager: Steve LaBar
Contractor: DC Taylor Co.
Construction Budget: $2,300,000
Construction Period: May 2011 - November 2011